MANUFACTURING CAPABILITY

Built around controlled manufacturing, not catalogue claims.

HHSV manufactures safety and pressure-relief valves through controlled material inspection, machining, assembly, performance testing and document release. The production route is adjusted to the approved valve configuration and project requirements.

15,500 m²

Manufacturing facilities

180+

Production machines

260+

Employees

10,000+

Valve sets per month

MANUFACTURING SCOPE

Three linked controls from metal to release.

Machining capacity matters only when material identity, assembly status, test results and final records remain connected to the supplied valve.

01

Machining

CNC and conventional equipment support repeatable pressure-boundary and trim-component machining.

02

Assembly

Components are released into assembly only after required material and in-process inspection status is confirmed.

03

Performance testing

Finished valves are checked against the approved test and certification route before document release.

FACTORY FLOOR

Facilities shown through actual production images.

Replace any image later from Container → Style → Background without changing the layout.

MACHINING

Component machining and dimensional control

ASSEMBLY

Controlled configuration and build

INSPECTION

Inspection status before release

PRODUCTION PROCESS

Six controlled stages, kept in one desktop row.

The actual inspection and hold points depend on the valve, material, certification and customer-approved ITP.

01

Review

Approved specification, certification scope and document requirements

02

Inspect

Material identity, dimensions and required incoming checks

03

Machine

Pressure parts, trim and connections to the approved drawing

04

Assemble

Controlled BOM, spring, trim, sealing parts and serial number

05

Test

Shell, set pressure, reseating and seat tightness as applicable

06

Release

Final inspection, MDR documents, packing and shipment records

CAPACITY AND PLANNING

Capacity is planned by material, configuration and inspection route.

HHSV reports annual capacity of 8,000 tonnes and more than 10,000 valve sets per month. Actual order lead time depends on casting or forging availability, special materials, certification scope, document approval and witnessing requirements.

INCOMING MATERIAL

Material control begins before machining

SPECIAL MATERIALS

Material capability is confirmed against the actual service and specification.

Available grades are not a blanket approval for every pressure, temperature or medium. Material selection, casting or forging route, heat treatment, PMI, NDT and certification requirements are reviewed per enquiry.

CUSTOM MANUFACTURING

What can change

FINAL INSPECTION

Release requires product and document status

DELIVERY EVIDENCE

The manufacturing result must remain traceable after shipment.

Depending on the order, the delivery package can include material certificates, heat-number and serial-number records, inspection reports, test results, certificates of conformity, approved drawings and the MDR index.

MANUFACTURING REVIEW

Send the valve specification, service data and required inspection route.

HHSV will identify missing inputs, material constraints, approval documents, testing requirements and a workable production schedule.