SAFETY VALVE PROJECTS

Project evidence, organized around the engineering duty.

Each project reference connects the application, valve architecture, service conditions, engineering requirement and delivered solution using verified project information.

PROJECT INDEX

Selected Overseas Project References.

Explore selected HHSV project references by location, application, valve type, engineering requirement and delivery scope.

DUBAI · PETROCHEMICAL

Pilot-Operated Safety Valves

High-pressure gas pipeline overpressure protection.

TURKEY · REFINERY

Low-Lift Safety Valves

Liquid / incompressible process service.

VIETNAM · THERMAL / STEAM

Full-Nozzle + Balanced Bellows

Steam pipeline relief with outlet backpressure.

01 · PROJECT RECORD

Dubai Petrochemical Project

Pilot-operated safety valves supplied in volume for high-pressure gas pipeline overpressure protection in a petrochemical project.

Location

Dubai, UAE

Application

Petrochemical / high-pressure gas pipeline

Valve Type

Pilot-Operated Safety Valves

Medium

Gas

Service Conditions

High-pressure gas-pipeline service requiring precise set-pressure control, stable discharge performance and reliable seat tightness.

Engineering Requirement

Precise set-pressure behavior, stable discharge, small blowdown and strong seat-tightness performance for gas service.

Supplied Solution

Batch supply of pilot-operated safety valves selected for the project service requirements.

KEY FEATURES
  • Tight set-pressure tolerance and repeatability were key selection requirements.
  • Pilot-operated architecture selected for the high-pressure gas duty.
  • Small blowdown and seat tightness were important operating criteria.
Testing & Documentation

Inspection, testing and documentation followed the applicable project/order requirements. Detailed records are available through project-specific technical review.

Delivery Scope

Volume supply of pilot-operated safety valves for the Dubai petrochemical installation.

02 · PROJECT RECORD

Turkey Refinery Project

Low-lift safety valves supplied for pressure protection in a refinery liquid-medium system.

Location

Turkey

Application

Refinery / liquid pressure protection

Valve Type

Full-Lift Safety Valves

Medium

Liquid / incompressible fluid

Service Conditions

Liquid and incompressible-fluid relief duty requiring accurate opening height, repeatable set pressure and straightforward maintenance.

Engineering Requirement

Controlled lift behavior, repeatable set pressure and a compact, maintainable solution for incompressible-fluid service.

Supplied Solution

Full-lift safety valves supplied for the refinery liquid system.

KEY FEATURES
  • High discharge capacity
  • Consistent opening with excellent repeatability for critical gas / steam applications
  • Robust and compact construction
Testing & Documentation

Each project supply is supported by the agreed inspection, testing and technical-document package, with detailed records available during project review.

Delivery Scope

Supply of full-lift safety valves for the Turkey refinery liquid-service system.

03 · PROJECT RECORD

Vietnam Industrial Thermal / Steam Project

Full-nozzle safety valves with balanced bellows supplied for steam-pipeline overpressure protection in an industrial thermal system.

Location

Vietnam

Application

Industrial thermal / steam system

Valve Type

Full-Nozzle Safety Valves with Balanced Bellows

Medium

Steam

Service Conditions

Steam-pipeline service with outlet backpressure, requiring full-nozzle discharge capacity and balanced-bellows stability.

Engineering Requirement

High discharge capacity with a configuration that reduces the influence of outlet backpressure on stable relief performance.

Supplied Solution

Full-nozzle safety valves using balanced-bellows configuration for the project steam system.

KEY FEATURES
  • Full-nozzle construction selected for higher discharge-capacity demand.
  • Balanced bellows reduce the influence of outlet backpressure on valve operation.
  • Configuration selected for steam / thermal-system relief duty.
Testing & Documentation

Applicable project inspection, testing and technical documentation were controlled with the supply; exact records are not generalized beyond this project.

Delivery Scope

Supply of full-nozzle safety valves with balanced bellows for the Vietnam industrial thermal project.

PROJECT DELIVERY PROCESS

One controlled path from RFQ to shipment.

The exact deliverables depend on the purchase order, project specification and inspection plan. The workflow below is the normal control sequence.

01

RFQ

Collect service conditions, product requirements, standards, quantities and document scope.

02

Sizing

Confirm calculation basis, required area/capacity and configuration assumptions.

03

Technical Approval

Submit datasheet, calculation, drawings, certificate matrix and deviations for review.

04

Manufacturing

Procure and manufacture against the approved configuration and controlled BOM.

05

Inspection & Testing

Complete required material, process and performance inspections with witnessing where specified.

06

MDR

Compile approved drawings, material certificates, test records and conformity documents.

07

Shipment

Release after required approvals, document completion and shipping preparation.

RELATED CAPABILITIES

Project delivery depends on more than the valve body.

Safety Valves

Review the six product families and their actual model-level performance scope.

Engineering & Sizing

Turn service data into a calculable valve selection and technical quotation.

Quality & Testing

Review traceability, inspection, set-pressure and performance-test capability.

HAVE A PROJECT RFQ?

Start with the service data and required documents.

Send the specification, datasheet or existing valve nameplate together with the operating conditions. HHSV can prepare the sizing basis and technical quotation.