QUALITY CONTROL & PERFORMANCE TESTING

Every valve record should lead back to its material and test status.

HHSV controls incoming materials, heat-number identity, machining and assembly status, final pressure performance and the document package released with each applicable safety-valve order.

PERFORMANCE TEST

Pressure behavior verified before release

01

Incoming control

Verify documentation, identity, dimensions and specified material checks before production release.

02

Process control

Record inspection status through machining, component preparation and assembly.

03

Performance testing

Verify pressure containment, set pressure, reseating behavior and seat tightness as applicable.

04

Document release

Connect test reports, material records, serial numbers and final shipping documents.

TRACEABILITY CHAIN

Five records must describe the same supplied valve.

A certificate is useful only when its material identity can be matched to the pressure-containing parts and the final valve identification.

01

Supplier record

MTC and purchase specification

02

Heat identity

Heat number retained or transferred

03

Verification

PMI and NDT when specified

04

Valve identity

Serial or tag number assigned

05

Delivery record

Test reports and MDR mapping

INCOMING MATERIAL

Release begins with identity and condition

INCOMING CONTROL

MTC review does not replace physical verification.

The required checks depend on the material, pressure boundary, project specification and inspection plan. Results are recorded before the material is released into the applicable production route.

MATERIAL VERIFICATION

Inspection method, scope and evidence must remain separate.

Not every method applies to every component. The approved QAP or ITP defines required points and acceptance references.

CONTROL

WHAT IS CHECKED

EVIDENCE

MTC review

Grade, heat, chemistry, mechanical properties and heat-treatment status

Certificate linked to purchase item and heat number

Visual / dimensional

Surface condition, marking, dimensions and wall thickness where required

Incoming inspection record

PMI

Alloy identity for specified pressure parts or trim

PMI report with item or heat reference

PT / MT

Surface discontinuity examination when applicable

Procedure, operator and result record

UT / RT

Volumetric examination when specified by scope

Procedure, coverage and result record

Heat identity transfer

Identity maintained after cutting or machining

Traceability log or transferred marking

NDT CAPABILITY

Select the method by material, defect type and approved scope.

The images illustrate available inspection activities; actual examination coverage and acceptance criteria are specified per order.

PT

Liquid penetrant examination

MT

Magnetic particle examination

UT

Ultrasonic examination

RT

Radiographic examination

IN-PROCESS INSPECTION

Six status checks before shipment release.

Desktop uses a six-column Grid; tablet uses three columns and mobile one column.

01

Drawing / BOM

Approved configuration and revision available

02

Machining

Dimensions and critical surfaces checked

03

Trim / spring

Component identity and assembly basis confirmed

04

Assembly

Cleanliness, configuration and serial number controlled

05

Test release

Required hold points and instruments confirmed

06

Final review

Product, marking and documents audited together

PERFORMANCE TESTING

Four results answer four different questions.

Passing one test does not imply that every pressure, functional or leakage requirement has been verified.

01

Shell test

Checks pressure-boundary integrity using the applicable pressure, medium, duration and acceptance basis.

02

Set-pressure test

Confirms the valve begins to operate at the specified set-pressure condition and tolerance.

03

Reseating behavior

Records closing or reseating behavior and any required blowdown-related observation.

04

Seat-leakage test

Evaluates seat tightness using API 527 or the approved alternative test requirement where applicable.

SEAT TIGHTNESS

Test status is recorded before final release

API 527 SEAT-LEAKAGE TESTING

State the test basis instead of saying only “leak tested.”

API 527 provides methods for determining the seat tightness of metal- and soft-seated pressure relief valves. Application to the supplied valve is confirmed against valve design, set pressure, test medium, project requirement and certificate scope.

QUALITY DOCUMENTS

Test evidence is delivered as a controlled package.

The final file list is agreed during quotation and document-submittal review.

01

MTC package

Material certificates matched to relevant pressure parts

02

PMI / NDT reports

Specified verification records and examination results

03

Traceability list

Heat number, valve serial number and customer tag mapping

04

Performance reports

Shell, set-pressure, reseating and seat-leakage results

05

Inspection records

ITP points, third-party witness and release notes

06

MDR index

Controlled list of approved and final manufacturing documents

THIRD-PARTY INSPECTION

Witnessing must be planned before the test date.

Inspection scope, notice period, travel, fees and repeat-test responsibility should be commercially defined.

01

Before production

Agree QAP/ITP, hold points, witness points, procedures and document list.

02

During inspection

Record attendance, test conditions, instrument status, comments and dispositions.

03

Before shipment

Close open points and confirm product release and MDR status independently.

DEFINE THE INSPECTION SCOPE

Send the valve specification, required tests and document list with the RFQ.

HHSV will identify applicable inspection points, test requirements, witness timing and the quality-document delivery boundary.